The jetty and other facilities admeasures approximately 2 hectares. The land area is expected to increase by 40% on account of reclamation. To achieve this, we have embarked on construction of quay wall and dredging. The entire area that would be reclaimed shall be specially designed for hard stacking of heavy material and equipments that are generally used in oil industry.
Equipments and Assets
* Forklifts
* Generators
* Cranes
* Engineering workshop
* Barges